Power lines, substations and installations — built to TANESCO standards.
Saibaru Electrical Contractors Ltd surveys, builds, tests and energises medium- and low-voltage networks for industry, agriculture, estates and public institutions across Tanzania — from the TANESCO tap-off to the last LV panel.
A Tanzanian electrical contractor that takes the job to power-on.
Based in Dar es Salaam since 2014, Saibaru has grown from installation and supply work into a CRB Electrical Contractor Class I — the highest class, allowed to take electrical contracts of any value.
We handle the whole chain a client needs to get connected: route survey and pegging, design and bill of quantities, TANESCO applications and approvals, line construction, transformer and switchgear installation, testing, commissioning and energisation. Our crews have built for TANESCO, industrial parks, factories, logistics firms, road contractors and public boards from Dar es Salaam and Pwani to Tanga and Mara.
To deliver high-quality electrical products and services while promoting sustainable and efficient solutions — ensuring the safety, reliability and energy-efficiency of electrical systems in domestic and industrial settings.
To be recognised as a leading electrical solutions provider in East Africa.
Registration
- Company
- Saibaru Electrical Contractors Limited
- Incorporated
- 17 Sep 2014 · BRELA No. 111316
- CRB
- Electrical Contractor Class I · E1/140/07/2026
- Contract limit
- Unlimited value per contract
- TIN
- 125-130-976
- VRN
- 40-035061-L
- Head office
- Majimatitu – Charambe, Mbagala, Temeke · P.O. Box 1206, Dar es Salaam
What we build
Supply, installation, testing and commissioning — every item to TANESCO technical standards and specifications.
33 kV & 11 kV overhead lines
Single- and double-circuit lines on concrete or wooden poles: survey, pegging, erection, dressing, stays, stringing, sagging and binding.
Substations & transformers
Pole- and ground-mounted transformers from 50 kVA to 2500 kVA, 33/0.4 and 11/0.4 kV, with cable terminations, fuses, arresters and earthing.
MV protection & metering
Auto-reclosers, ring main units, load-break switches, drop-out fuses and TANESCO MV metering units.
LV distribution panels
Main distribution boards with ACB incomers and MCCB outgoers for factories, pump stations, depots and offices.
Line & transformer relocation
Shifting of HT, LT lines and transformers for road, bridge and building projects — planned with TANESCO outages.
TANESCO connection
Applications, contractor letters, design to TANESCO standards, metering and energisation — we deal with the utility so you don't have to.
From survey to power-on
Survey & route
Walk the route with the client and TANESCO; agree pole positions.
Design & BOQ
Single-line diagram, layout and a fully priced bill of quantities.
Approvals
TANESCO application, contractor letters and site handover.
Construction
Poles, dressing, stays, stringing, sagging; transformers and panels.
Testing
Insulation, earthing and protection tests; commissioning.
Energisation
Metering, TANESCO energisation and handover documents.
33 kV line and 1250 kVA substation for an agro-processing estate, Rufiji (Pwani)
A complete grid connection for a large irrigated estate — built on a working farm, together with the client's engineers and TANESCO.
- 4 km single-circuit 33 kV overhead line on 13 m concrete poles, 150 mm² ACSR
- 33 kV MV metering unit (Tariff 3) and pole-mounted auto-reclosers
- 1250 kVA 33/0.4 kV ground-mounted transformer on its own plinth
- LV main distribution panel with 2000 A ACB incomer
- Extension: 1.2 km 33 kV line to the estate's industrial zone







30 projects for utilities, industry and contractors
A selection of completed and current works. Click any column heading to sort.
| Client | Scope of works | Location | Year | Duration |
|---|---|---|---|---|
| Rufiji Banana Agroprocessing Ltd (Top Crop group) | 4 km 33 kV line (150 mm² ACSR); 1250 kVA transformer; 630 A + 400 A auto-reclosers; MV metering; LV panel 2000 A ACB — plus 1.2 km industrial-zone extension | Ikwiriri, Rufiji, Pwani | 2026 | In progress |
| Tanzania Sisal Board | 2.22 km 33 kV line; transformers 500 kVA (Taula), 315 kVA (Kibaranga), 100 kVA (River Zigi); cable termination; metering panels 250 A + 2×630 A | Tanga | 2025 | 44 working days |
| ACME Ecopet Ltd | 11 kV line; 1×1500 kVA 11/0.4 kV transformer; 50 mm² cable termination; auto-recloser and metering unit | Mabibo NIT, Dar es Salaam | 2024 | 14 working days |
| China Petroleum Pipeline Engineering Co. (CPP) | 33 kV line; transformers 630 kVA and 500 kVA; metering panel 800 A | Handeni and Kilindi, Tanga | 2024 | 4 weeks |
| GSM Mall | 1×315 kVA transformer installation | Kigamboni, Dar es Salaam | 2023–2024 | — |
| Henan Highway Engineering Group (HEGO) | Shifting of 33 kV and LV lines and four transformers for the Kwediyamba–Mafuleta road (13 km) | Handeni, Tanga | 2024 | 8 weeks |
| Littlegreet Company Ltd | 33 kV line; 1×1000 kVA transformer; 70 mm² cable termination; metering unit | Kisarawe II, Kigamboni, Dar es Salaam | 2024 | 20 working days |
| Lodhia Industries Ltd | 33 kV line on concrete poles; metering unit | Kisemvule, Mkuranga, Pwani | 2024 | — |
| Saturn Corporation Ltd | 33 kV line; 1×2500 kVA transformer; 95 mm² 33 kV cable termination; auto-recloser and metering unit | Kisarawe II, Kigamboni, Dar es Salaam | 2024 | 10 working days |
| Sumry's Enterprises Ltd | 33 kV line; 1×500 kVA transformer; 630 A metering unit | Mkuranga, Pwani | 2024 | 10 working days |
| TANESCO | 9.8 km 33 kV double-circuit line on concrete poles — Kisemvule feeder | Mwandege, Mkuranga (Pwani) to Mbagala substation | 2024 | 60 working days |
| Tanzania Ruider Company Ltd | 33 kV line; 1×1630 kVA transformer; 70 mm² cable termination | Kisarawe II, Kigamboni, Dar es Salaam | 2024 | 10 working days |
| Bakhresa Group (Azam) | 33 kV line on 15 m concrete poles | Mwandege, Mkuranga, Pwani | 2023 | 7 working days |
| DMG Heavy Industries (Dar es Salaam Merchant Group) | 33 kV line on concrete poles; 1×315 kVA transformer | Kimbiji, Kigamboni, Dar es Salaam | 2023 | 10 working days |
| Majestic Holding Company Ltd | 33 kV line; 2×2500 kVA transformers; cable termination; auto-recloser, metering unit and RMU | Kisarawe II, Kigamboni, Dar es Salaam | 2023 | 14 working days |
| Max Steel Ltd | 11 kV line; 1×1250 kVA 11/0.4 kV transformer; cable termination; auto-recloser and metering unit | Kipawa, Dar es Salaam | 2023 | 14 working days |
| Meru | 33 kV line; 1×200 kVA transformer; 630 A metering panel | Nyerere, Kigamboni, Dar es Salaam | 2023 | — |
| S. Gravita Company Ltd | 33 kV line; 1×1000 kVA transformer; 70 mm² cable termination; auto-recloser and metering unit | Kibaha, Pwani | 2023 | 7 working days |
| Shandong Luqiao Group | 33 kV line (wooden poles); 1×500 kVA transformer; 630 A metering panel | Amani, Muheza, Tanga | 2023 | 14 working days |
| Shanxi Construction Engineering & Mineral Co. (Shanxi CIG) | 33 kV line extension; transformers 1000, 500, 400, 315, 200, 125 and 50 kVA; metering units | Kisarawe II, Kigamboni, Dar es Salaam | 2022–2023 | 8 weeks |
| Xutarn Company Ltd | 33 kV line; metering unit (100–200 A) | Mkuranga, Pwani | 2023 | 10 working days |
| Alfa Pharmaceuticals Ltd | HT line; 1×1500 kVA transformer; HT cable termination; auto-recloser and metering unit | Mbagala Rangi Tatu, Dar es Salaam | 2022 | 14 working days |
| China Henan International Cooperation Group (CHICO) | Shifting of 33 kV line | Rubana weighbridge, Bunda, Mara | 2022 | 20 working days |
| Elsewedy Electric East Africa Ltd | 33 kV line; 3×1500 kVA transformers; cable termination; auto-recloser and metering unit | Kisarawe II, Kigamboni, Dar es Salaam | 2022 | 60 working days |
| Chibango Construction Ltd (main contractor) | Electrical sub-contract — commercial and residential development | Dodoma | 2021 | — |
| China Civil Engineering Construction Corp. (CCECC) | Relocation of 11 kV and 400 V lines and transformer at the mini depot | Ubungo flyover, Dar es Salaam | 2021 | 30 working days |
| Group Six International Ltd | Relocation of 33 kV line; transformers 500 kVA 33/0.4 kV and 500 kVA 11/0.4 kV | Kisarawe II, Kigamboni; TFF Sport Centre, Tanga | 2021 | 10 working days |
| KEDS Company Ltd | 33 kV line; 1×2000 kVA transformer; 95 mm² cable termination; auto-recloser and metering unit | Kibaha, Pwani | 2021 | 10 working days |
| Grayhill Mining Ltd | 13.5 km 33 kV line; 1×500 kVA transformer; metering unit 50–200 A | Kwa Msisi, Handeni, Tanga | — | 50 working days |
| Hainan International Ltd | 33 kV line; 1×315 kVA transformer; auto-recloser and metering unit | EASTC, Changanyikeni, Dar es Salaam | — | 14 working days |
Safe crews, tested installations, utility-grade materials.
Medium voltage leaves no room for shortcuts. Our sites run on TANESCO standards, supervised crews and tests before anything is energised.
- TANESCO technical standardsEvery line, transformer and panel is specified and built to the utility's standards.
- PPE and supervision on every siteTrained crews, supervisors and safety equipment are part of our scope and price.
- Testing before energisationEarthing, insulation and protection checks; commissioning with the client and TANESCO.
- Daily progress reportingWritten reports by activity — pits, poles, stringing — so clients see where every kilometre stands.
Trusted by utilities, industry and contractors

…and Top Crop Tanzania / Rufiji Banana Agroprocessing (2026).
Tell us about your project
Send the location, the load (kVA or kW) and any drawings. We reply with questions, a site visit or a priced proposal.
-